View Single Post
Old 05-03-2020, 04:27 PM   #12
Unlimicon
Junior Member
 
Join Date: Apr 2019
Location: Brenham
Posts: 15
Default Update pictures

I took the advise of doing the inside first. It has made things way easier. 110v amd 12v is wired up. Plumbing is almost done. Roof and floor decking is done. I’m gonna put the skins on before I do the inside paneling. The insulation is supposed to be 1 1/2” like the tubing but it’s a hair thicker and I don’t want to fight the panels to get them flat when installing
Attached Thumbnails
9B638F4A-C2FA-4925-8AAA-6E21F6546218.jpg   1D2C818A-B4D2-45E1-91FB-39891F234D26.jpg   47363BEE-5262-471A-B8F3-5331A4E2741B.jpg   71B606B3-CB9C-4078-A237-4710600D0034.jpg   5215407F-2DAB-4D82-A7CA-5C722317A121.jpg  

Unlimicon is offline   Reply With Quote