Thread: Frame Welding
View Single Post
Old 07-09-2012, 09:36 PM   #149
#90-GTSC
Senior Member
 
#90-GTSC's Avatar
 
Join Date: Nov 2010
Location: Grafton
Posts: 285
Default

Quote:
Originally Posted by Kenn View Post
I cut the donor tank and riveted a flange inside the long end. I took 6" off the length and if needed I can take out another inch. I am waiting for the plastic water tank to arrive before I make the filler cover. I made a cowl to cover the front jack and it will be painted white when I paint the truck.
Are you making a water tank out of the fuel tank? or turning the fuel tank into a dual purpose tank. I'm confused. Is the tank sitting on end the same one installed on the truck?

Thanks!

Dick
__________________
Started looking for 379 Peterbilt TC, 24' to 30' box, bumper pull--but ended up w/1999 Liberty Coach conversion of 45' Prevost XLV bus. 1,000sf heated/AC'd race shop w/dump station, 50amp shore pwr where bus parks, 3 NASCAR/ARCA race cars & 26' Bravo trailer.
#90-GTSC is offline   Reply With Quote