View Single Post
Old 05-13-2020, 09:37 PM   #54
Pntyrmvr
Senior Member
 
Pntyrmvr's Avatar
 
Join Date: Mar 2019
Location: GTA
Posts: 154
Default

Next steps are to finish the uprights, clean the roof frame, and paint it. The inside of the frame will be lined with Blueskin to keep air and water off the metal.

Then the frame goes up and is attached to the top of the box walls.

The air dam will be skinned and then permanently installed against the box. The connection to the box will be skinned as well; in aluminum.

From there the roof gets a surprise addition.
Pntyrmvr is offline   Reply With Quote