View Single Post
Old 10-27-2017, 02:13 PM   #195
Java230
Senior Member
 
Join Date: Oct 2014
Location: Seattle
Posts: 227
Default

Here is a recap on the thrash that was Friday. Whoever decided I needed to get the water done before we left was a little nuts.... Needless to say, the three hours I had planned for it wasn't enough. Oh well, I dragged my *** out of bed at 6:30 and got to work.

I had to connect the tank to the water heater, both of which were installed at this point, then do all the tank fill side of things, install the water pump, wire all that stuff, and do the grey tank. (yeah typing all that out reminds me three hours were not nearly enough, planned to work 7-10, cleanup and pack and leave at 12)

So to start we have to install the faucet. Kids oil based clay works great for making a dam.


Now you hope and prey you don't break the tile.


Breathe again....


And drop the faucet in. One thing checked off the list.
Java230 is offline   Reply With Quote