wiring rough in is just about done. I used that entire 250' roll of 14/2, and i didn't use it for the lighting circuits (18 gauge for the LED's). I didnt quite expect it to go tat fast! I need another 30' probably. Need to run circuit for the heater and water pump still. I will likely run those ousisde the wall later on.

Door and double pane windows have been ordered too!







Two main areas for the elec, under the bed, where the batteries, inverter/charger fuse panel and breakers will live, and the end of the cabinets of the opposite side, where all the switches will be. The rest is lighting circuits, and conviniance plugs. I need to figure out a way to keep the end of the wires poking out of the walls/ceilings where I want them, duct tape may work, but the entire inside of the box is covered with frost at the moment, its cold out...

I got some rigid insulation to start furring the ceiling down with as well!
Java230 is offline   Reply With Quote