View Single Post
Old 07-06-2016, 08:55 AM   #27
solo318
Senior Member
 
solo318's Avatar
 
Join Date: Jul 2015
Location: Central Florida
Posts: 127
Default Captains log stardate 06july2016

I finally got this thing drivable again and took it to my local welding shop for some stainless welding.
Click image for larger version

Name:	20160706_093926.jpg
Views:	14
Size:	82.8 KB
ID:	2375
Click image for larger version

Name:	20160706_093922.jpg
Views:	12
Size:	90.5 KB
ID:	2376
The "bunk" is now connected to the stainless radius panels on the front of the box. The bunk area is now water tight.
Now comes the fun parts. We ripped out all of the old oak flooring, and replaced the I beams that were over the rear tires. They were rusted beyond belief from the road spray. The current plan is 3/4 pt plywood with 3/8 hardee board and porcelain tile. I ordered some mobile home under lament to go between the plywood and the I beams. That should keep the water out nicely.
Click image for larger version

Name:	20160706_094053.jpg
Views:	16
Size:	112.8 KB
ID:	2377
solo318 is offline   Reply With Quote