View Single Post
Old 05-03-2010, 05:51 PM   #187
Ran D. St. Clair
Senior Member
 
Join Date: Apr 2009
Posts: 212
Default

Status Update 5/3/10…

It has taken what seems like forever, but the walls and ceiling are now fully closed. All the joints are caulked and all the screw holes filled with non-shrink spackle. I even have the first coat of latex primer applied. In a week or so I should have the interior painted with white semigloss latex and then it will be time to begin work on the floor.

The floor should go quickly as it is just a single layer of 1/2” R-max under the 1/2" plywood flooring. Unlike the walls, there is no conduit to work around, though there are a few holes for air vents and gas lines. That means I am getting close to installing the vinyl flooring. I am looking forward to that day as a milestone of sorts. At that point I will have a perfectly livable, but empty room. There is still a long way to go, but I can see the finish line.
Ran D. St. Clair is offline   Reply With Quote