Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×

Click Here to Login
Register FAQ Community Calendar Today's Posts Log in

Join Truck Conversion Today
  Home · Search · Register  

Home » Factory Tour » Show Hauler Photo Options
2conv_p8280004.jpg
2conv_show_hauler_018.jpg
2conv_p8280006.jpg
2conv_p8280034.jpg
2conv_p8280007.jpg

« Previous image · Next image »

2conv_show_hauler_018
Framing Shop

« Previous image  · Slide Show · Next image »


Photo Details
Warpath


Senior Member

Registered: August 2002
Location: N.E. Ohio
Posts: 768
users gallery
Tons of metal! Literally. Floor and bin framing is in 2" x 3" tubular steel. The wall and roof are 1" x 3" tubular steel and 16" on center where possible. The red tape on the frame is the bonding tape by 3M used to secure the panels to the tubular steel. No rivets are required giving a smooth side and once those panels go on they aren't coming off.
· Date: · Views: 12,200
· Filesize: 49.5kb · Dimensions: 500 x 375 ·
Additional Info
Rating: ********** 10.00
Quick Rate: Poor Excellent
Keywords: Framing Shop

Photo Sharing Gallery by PhotoPost
Copyright © 2007 All Enthusiast, Inc.


All times are GMT -5. The time now is 03:02 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.