Okay, so here's my latest progress with phote's included.......


All joists up to the last 9 feet or so are in and all hangers are installed......next step is to attach brackets (already bought) that will hold the joists straight and to the floor. Will also attach a few brackets to the rim to provide maximum sheer for the floor sliding on top of the deck.
Attached Thumbnails
jkryikrikrkr.jpg   k76r6k.jpg   uyoly6.jpg  
__________________

hoodoo valley is offline   Reply With Quote
Old 06-27-2019, 11:25 PM   #42
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

You can see the joists are up off the floor for ventilation and to keep the floor from getting wet if anything leaks. The strips of wood at the bottom of the joist will hold the insulation in place.
Attached Thumbnails
.;uf;.jpg   tukltuko.jpg  
__________________

hoodoo valley is offline   Reply With Quote
Old 06-28-2019, 12:07 AM   #43
Senior Member
 
Weldman's Avatar
 
Join Date: Jun 2019
Location: MC
Posts: 119
Default

Box van going to come off the the truck slide down freeway take few cars out and come out still unscathed intact ready to be hitched back up, only problem on your end is few tossed dishes and your bed mattress tossed around. Nice work...
Weldman is offline   Reply With Quote
Old 06-28-2019, 09:22 AM   #44
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

That's certainly my concern. At least the internals moving around inside the box. Wish I was an engineer, but going to have to combat this issue as best I can because just as the Kinks song goes...... "I'm on a low budget". I simply don't have the money to get consultation!
hoodoo valley is offline   Reply With Quote
Old 06-30-2019, 09:05 AM   #45
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Little progress updates.......... 1 AM this morning, I went out and correctly positioned the floor, then mounted it to the wood deck from the rim joists using angle brackets. Then, I attached every floor joist to the floor through the bamboo runners using small brackets. This was more to hold the bottoms of the joists against warping and allowing gaps in my closed cell insulation, but also to keep the floor as a whole, from shifting. Tonight I start running the closed cell insulation through the table saw, and might start installing. Photos coming.....
hoodoo valley is offline   Reply With Quote
Old 07-01-2019, 10:29 PM   #46
Senior Member
 
samcrimm's Avatar
 
Join Date: Sep 2015
Location: Tullahoma
Posts: 361
Default

nice and a lot of work!
__________________
2005 Renegade #1204 42 footer Columbia M3200CH-435,12 speed auto Cat 12 kw Genset, Roadtrip Mission in-mot Dish Network, Washer dryer combo, Jeep Liberty toad,1973 Cessna Skylane,1955 Chev 210 Belair survivor
samcrimm is offline   Reply With Quote
Old 07-06-2019, 03:56 AM   #47
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Here's some phote's.........
Attached Thumbnails
IMG_20190630_220438198.jpg   IMG_20190630_220532305 recent recent.jpg   tukltuko.jpg  
hoodoo valley is offline   Reply With Quote
Old 07-06-2019, 04:10 AM   #48
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Installing the closed cell. Caulking each layer with silicone. Finally moved the stack of rigid after nearly a year at the door.
Attached Thumbnails
IMG_20190704_102957014.jpg   IMG_20190705_234629834.jpg   IMG_20190705_234643876.jpg   IMG_20190706_003802849.jpg   IMG_20190706_010742386.jpg  

hoodoo valley is offline   Reply With Quote
Old 07-06-2019, 04:12 AM   #49
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Now to prep the last 11 feet of floor, then fiberglass. Still a little welding on the curb.
Attached Thumbnails
IMG_20190706_010748986.jpg  
hoodoo valley is offline   Reply With Quote
Old 07-06-2019, 11:13 AM   #50
Senior Member
 
Weldman's Avatar
 
Join Date: Jun 2019
Location: MC
Posts: 119
Default

Surprised you didn't run the water lines in the floor just in case they leaked or are they running under the floor structure you got in? Personally would of ran PEX below it all to where the lines needed to come up then ran them through the polyurethane foam upwards. What is your plans?
Weldman is offline   Reply With Quote
Old 07-07-2019, 03:11 AM   #51
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

I absolutely don't want anything to freeze, and it's been -35 here before. I also want to be able to access the water lines and electrical in case of failure. I also fear fire especially with that closed cell insulation. Therefore, water and electrical are going to be run just inside of the exterior walls, in the interior space inside specially built baseboard (pipe chase). I'm still a ways away, but I'm hoping to be on that before the weather starts changing in September.
hoodoo valley is offline   Reply With Quote
Old 07-07-2019, 09:05 AM   #52
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Many probably will see this as excessive but I used to live in a 1968 Airstream travel trailer back when I was younger. I just remember struggling to heat the space in the Winters and vowed that I was going to build this space to not only last...... but to be easily heated!
hoodoo valley is offline   Reply With Quote
Old 07-07-2019, 10:07 AM   #53
Senior Member
 
Weldman's Avatar
 
Join Date: Jun 2019
Location: MC
Posts: 119
Default

I don’t see it as excessive, then again you seen my work too, just intelligent way to do it. My thinking was you were going to insulate the under belly of the rig and run PEX between the two layers of insulation without any connectors underneath just at points of where the PEX comes up such as water stops. Though the pipe chase works well too with drain points if the PEX connections break loose and conduit for the electrical. That’s one thing I like about spray foam insulation it was fire resistant and I tried setting piece on fire it just smoldered out. Running stranded wire in there right¿
Weldman is offline   Reply With Quote
Old 07-07-2019, 01:45 PM   #54
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

I had thought about insulating underneath to gain more height, but decided against it. I'll have 7 feet of ceiling after insulation. Enough to keep me from hitting my head!


This is a unique build. I started out just intending to build a tiny house, then slowly started morphing towards off grid if need be, at least keep that option in sight. The forward portion is going to sort off serve as storage / living space whereas the rear section is going to be primarily living with a shower and toilet. Was at first going to do a regular set up for tapping into shore power / septic, now re thinking that, with the possibility of having a black water tank and letting gray water pour on the ground. Did the gray water thing for years and years on my home. I really love soft intricate lighting and so for my lights I was intending using the lights shown here on dimmers to illuminate the floors, then possibly overhead lights build into chases along the exterior walls. I was contemplating using solid wire as in direct burial of the proper gauge, but still always eager to learn better ways..... should I be looking at strand wire? I have rolls of it from projects. My water lines are going to be copper because I hate Pex even though I know it's better. I've installed a crap ton of both, but I much prfer the neatness of sweated copper! The plumbing is designed in my build to be the absolute minimum, so everything is going to be grouped together fairly tight.
hoodoo valley is offline   Reply With Quote
Old 07-07-2019, 02:25 PM   #55
Senior Member
 
Weldman's Avatar
 
Join Date: Jun 2019
Location: MC
Posts: 119
Default

Take a piece of stranded wire and flex it as much as piece of Romex wire and see which one breaks first, that's what's going on as the wire vibrates in vehicle. I also advocate the use of marine tinned wire cause it's most resistant to any corrosion and the strands are thinner to offer more flexibility. Ancor is the brand I use but there is others out there such as Pacer group.
Don't I repeat don't use wire nuts on stranded wire if you don't already know, it cuts into Romex and it's how it holds, it would cut the strands on stranded wire. Want to get really good at wiring, read into ABYC codes and RVIA rules and regulations combined with NEC. Remember 3% voltage drop is the max and Blue Seas has a calculator to size up what you need.
Weldman is offline   Reply With Quote
Old 07-08-2019, 10:01 PM   #56
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Sorry for the delay in responding.... been so busy!


I've done a great deal of household and commercial electrical, though not up on the latest codes which are always being modified, and I so disagree with some of the notions in what is being done today. I was aware of the wire nuts regarding strand wire and the flexibility issue as well, although I wasn't really thinking about that in my application. I know that in commercial applications they use strand wire in conduit and so I suppose that I could use conduit as well, within the chases in my build. I really would like to use copper plumbing in my set up, and already was going to incorporate flex in certain areas for vibration / shifting, but really should use pex. I already have the tools for both. I just like the neatness of copper, but you can also buy straight lengths of pex as well.
hoodoo valley is offline   Reply With Quote
Old 07-08-2019, 10:08 PM   #57
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

As for my latest update........ All floor framing is completed up to the point of having to fiber glass the remaining 10 feet of wood deck. Last night I laid down 2 feet and did repairs to the surface areas of minor damage, and putting in missing screws from when I pulled all the wood flooring up, and was waiting for the new 5/16 self tapping screws to show up. My knees are super super bad from high mileage and so I can only kneel for X amount of time while I sweat bullets in pain. I largely lay on my side as I work, but here again, a person can only spend so much time on an elbow that is also gainked from years of swinging a hammer. Getting that fiber glassing and floor framing done will be cause for opening a bottle of wine as it signifies the end of the most grueling aspect of my project. Walls and lid will be cake!
hoodoo valley is offline   Reply With Quote
Old 07-09-2019, 12:04 AM   #58
Senior Member
 
Weldman's Avatar
 
Join Date: Jun 2019
Location: MC
Posts: 119
Default

It's understandable of being busy no quick replies needed here. Yes some of the codes are far fetched useless though I like the ABYC ones best since they are more feasible and put in most severe environment just like when I built a house I never finished (long story in itself, I lost the house). Built to Miami-Dade building codes when only lesser codes needed. Who cares if the PEX going straight or not, won't see it anyways and more reliable to constant temperature change of expanding and contracting of the material plus the vibration that will be going on. Just think, if you can flex piece of Romex going down the road imagine what that copper pipe is going to do on the soldering joints, plus less chemicals in the line. Wine I guess will work for the small feat of completing part of it, but when you get this project done you better break out the bourbon.
Weldman is offline   Reply With Quote
Old 07-09-2019, 01:53 AM   #59
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Jim Beam under the counter right now.......


It sucks that I'm so detail oriented and really particular about neatness. I agree that Pex is better, but it drives me batshit crazy when I see horribly installed pex. I haven't worked through all the details yet, and still a ways away.

Got another 2 feet closer to the back door on the glassing. 6 feet to go.........
hoodoo valley is offline   Reply With Quote
Old 07-10-2019, 12:48 AM   #60
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Tonight I completed the remainder of the floor joists, adding the 1/2 inch strippage to the bottom sides to hold the rigid insulation in place. Loaded my welder and bottle via the lift gate for some welding to the curb that I hadn't finished yet. That'll happen tomorrow night.
__________________

hoodoo valley is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 06:12 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
×