View Single Post
Old 06-09-2019, 10:27 AM   #18
hoodoo valley
Senior Member
 
Join Date: Feb 2019
Location: void
Posts: 156
Default

Tonight, I walk the fiberglass right up to the stack of insulation, then throughout this week, I'll start framing my floor over what's been fiberglassed already. Next step is to insulate that portion of my floor, reducing that pile a bit, then once the subfloor is down on that portion, I'll move the stacks of insulation and OSB to that section of floor, and then continue fiberglassing the rest.
hoodoo valley is offline   Reply With Quote