View Single Post
Old 06-09-2017, 09:43 AM   #9
GUNGUY
Junior Member
 
Join Date: Feb 2017
Location: Mesa
Posts: 13
Default

Quote:
Originally Posted by Bob86ZZ4 View Post
I've also got no engineering skills. Just wondering about that receiver hitch? Would some lateral members running from the frame rails down to that lower cross bar (where the receiver is mounted) make sense? Provide more support to that lower section? Just seems like that might strengthen that hitch a bit?
They are in the plan.

I am closing the back all the way across with a center door and slider set up for the generator and side doors on the right and left where I will put the fuel cell, batteries, and such. When I finish the framing I will add some struts to tie the frame into the lower bumper section. I place to have them split seam of the original frame and extensions and tie them together. I also have some plates we cut to double up the sides of that connection. The deck comes off as a separate piece from the back boxes and extensions. I did temperately weld them for the run to Texas and only used the goose neck set up.

Here is pic of the deck attachments and the well for the ball
Attached Thumbnails
19030222_10212501319906573_9101335621232471850_n.jpg   DROP FOR BALL.jpg  
GUNGUY is offline   Reply With Quote