View Single Post
Old 12-05-2009, 11:42 AM   #10
geofkaye
Senior Member
 
Join Date: Apr 2006
Posts: 625
Default

......the whole trick is measure twice and cut once....i have moved supports after cutting and wires by lengthening after cutting...the doors for MH have rigid frames that is where the support comes from...it needs to be fastened at the end/bottom of the legs and at the top too....the rest can be a glue job with a mastic....just use a fine tooth blade and _go_slow_...also use duct tape to keep from scratching the painted aluminum......the insulation will come out very easily as most is pink glass....foam board is easier and spray foam is the easiest as the two wall panels are glued together by the foam....it comes out as a blank...if any wires are cut just rewire and tuck inside of the frame....nothing too it.....the only trick is to _go slow_ when cutting with a saws-all....if the panels are not glued together a jig saw will do the trick- drill the corners first and draw the cutting lines on both sides...._.cut_slowly_.......doors can be made any size you need as most are custom made now days.......geofkaye and the Rivercity Group
geofkaye is offline   Reply With Quote